SQUARE FOOTAGE121,000
ARCHITECTKirksey Architecture
ADDRESS840 Gessner Rd., Levels 9-13
DiscoverAre you seeking a commercial construction partner with an impeccable track record? We’re ready to exceed your expectations. Call us today, 713-782-7660.
SQUARE FOOTAGE121,000
ARCHITECTKirksey Architecture
ADDRESS840 Gessner Rd., Levels 9-13
DiscoverAre you seeking a commercial construction partner with an impeccable track record? We’re ready to exceed your expectations. Call us today, 713-782-7660.
2023 HBJ LANDMARK AWARDS FINALIST | Headquarters Move
2023 REDNEWS AWARDS WINNER | Interior Design Office/Natural Resources
Cabot Oil & Gas and Cimarex Energy merged and rebranded to create Coterra Energy. The Coterra team hired O’Donnell/Snider Construction (OSC) to complete the construction of their new, Houston-area office. Following the demolition of the existing space, the build-back includes several multi-functional features such as collaboration rooms, open office spaces, control rooms, and an interconnecting monumental staircase. These various spaces were put in place to ensure that the numerous needs of Coterra’s employees work needs were met as well as providing ample opportunities for team collaboration. All these major elements were accented with high-end, modern finishes such as specialty visual and audio equipment, banquette seating, supergraphics, DIRTT wall panels, specialty turf and Arktura ceilings. With both a modern feel and functionality in mind, OSC created a practical space that was uniquely Coterra.